Harlow Bros. LV Switchroom

Due to new machinery and general expansion of the site, Harlow’s required a new main panel to cope with the higher demand of power. Here you can see the up-rated tails from the main incomer, new panel with upgraded isolators and connection panels. We also installed a sizeable power factor correction unit in order to balance the loads more evenly resulting in a substantial cost saving.

2 new cables were run in to accommodate the higher demands from the site. the old cables then had their demands down-rated and new connections made into the panel.